May 26, 2025
1. The workload during the running-in period should generally not exceed 80% of the rated workload, and an appropriate workload should be arranged to prevent the machine from overheating due to long-term
continuous operation.
2. Pay attention to the indications of each instrument frequently. If any abnormality occurs, stop the machine in time to eliminate it. Stop the operation before the cause is found and the fault is eliminated.
3. Pay attention to regularly check the lubricating oil, hydraulic oil, coolant, brake fluid, fuel, oil (water) level and quality, and pay attention to check the sealing of the whole machine. If the oil and water are too insufficient during the inspection, the cause should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended to add grease to the lubrication points every shift during the running-in period (except for special requirements).
4. Keep the machine clean and adjust and tighten loose parts in time to prevent loose parts from increasing wear or loss.
5. After the running-in period, the machine should be maintained compulsorily, and inspection and adjustment should be done well, and attention should be paid to the replacement of oil.
In short, the requirements for the use and maintenance of loaders during the running-in period can be summarized as: strengthen training, reduce load, pay attention to inspection, and strengthen lubrication.
As long as you pay attention to and implement the maintenance and care of the loader during the running-in period as required, you will reduce the occurrence of early failures, extend the service life, improve operating efficiency, and make the machine bring you more benefits.